Enhance LPS for Tank roof T-80

Client PTT OR Main contractor Critical Facility (Thailand) Co.,Ltd. Tank no. T-80 Scope -Engineering design calculation. 1.Verify Existing Aluminium tank dome roof for new load from lightning pole 2.Verify Existing tank shell for new load 3.Add new Aluminium platform and new lightning pole -Details drawing for construction. More pictures

admin

17/10/2021

Enhance LPS for Tank roof

Client PTT OR Main contractor Critical Facility (Thailand) Co.,Ltd. Scope -Engineering design calculation.1.Verify Existing Aluminium tank dome roof for new load from lightning pole2.Verify Existing tank shell for new load-Details drawing for construction permit.-Tank no. T61, T62, T66, T67, T68, T71 and T84

admin

16/10/2021

New Fuel Oil Tank Project

Client SPRC Main contractor CB&I Sub-Contractor Critical Facility (Thailand) Co.,Ltd. Scope -Engineering design calculation.1.Design Aluminium lightning pole at tank Aluminium dome roof.2.Verify Aluminium platform on top tank for new load from lightning pole-Details drawing for construction permit.-Tank no. 60D355 and 60D356

admin

16/10/2021

NON COMPLIANCE STAGE 01

Client JSR BST Elastomer (JBE) Co., Ltd. Scope -Engineering design calculation.-Details drawing for IEAT construction permit.1-Construction of NBL Loading Station2-Roof Addition over area of Cooling tower3-Shade Roof Addition for Nitrogen Purifier4-Shade roof addition for fire pump area ( cancel)5-Construction of sludge storage area6-Construction of PTT Metering Station7-Shade Roof Addition connecting to Chemicals Warehouse l8-Construction of […]

admin

16/10/2021

STEP-04 Project

Client JSR BST Elastomer Company Limited Main contractor Italthai Engineering Scope -Engineering design calculation and drawing IEAT construction permit.-Engineering design calculation and drawing for construction.-Detailing drawing construction.-New chemical building, pump foundation, and tank foundation.

admin

16/10/2021